Kalinchock Hydropower Company Limited

ABOUT US

The first (pilot) project of Kalinchock Hydropower Ltd. is 5000 kW. Sangu (Sorun) Khola Small Hydroelectric Project, which is under construction in Kalinchock, Khopachangu and Sangu (Sorun) VDCs of Dolakha District. It is designed to take water from Sangu (Sorun) Khola, generate 29.72 GWh of energy, having its powerhouse near the confluence of Sangu (Sorun) Khola and SingatiKhola. A 8.0 km long 132 kV transmission line (Sharing) will transmit the produced power to 132 kV Singati Substation.

The company’s core business is Hydropower development managing comprehensive management of study to carry out feasibility study to determine the technical feasibility and financial viability of the Hydropower Project, which will beinterconnected with the Integrated Nepal Power System (INPS). The study report can be used as a basis for concluding Power Purchase Agreement (PPA) with Nepal Electricity Authority (NEA), for obtaining the generation license from DOED and for funding arrangement of the project. The main tasks carried out during the field investigations are topographical survey and mapping of project area,surface geological mapping and hydrological survey. The main outcome of the study incorporates the general arrangement of project structures including feasibility level design and drawings and power and energy computation from the project.